Power grid planning just got more precise. The LandGate platform has now introduced ATC (Available Transfer Capacity) and offtake capacity data specifically for line taps, bringing the same comprehensive analysis we've provided for substations to this critical infrastructure component.


This development addresses a longstanding challenge in grid analysis. Until now, engineers and planners have had to examine capacity data at both ends of a transmission line, then manually calculate the lesser of the two substation results to determine project feasibility. This process was time-consuming and left room for error in siting studies.


With dedicated line tap capacity data, users can now access direct measurements that eliminate guesswork and provide a clearer picture of grid capabilities. This enhancement represents our commitment to delivering tools that make power system analysis more accurate and efficient.



Understanding Line Tap Capacity in Grid Planning


A line tap represents connecting a project along a transmission line, allowing power to be drawn off or fed into the grid without requiring building to an existing substation. These connection points play a vital role in distributed generation projects, industrial connections, and grid modernization efforts.


Traditional capacity analysis required clients to evaluate the substations data at both ends of the transmission line to approximate an analysis of tapping the transmission line, creating a multi-step process that could introduce calculation errors. The available capacity at any given line tap depends on various factors including current load flow, thermal limits, and system stability requirements now calculated at the midpoint of the transmission line by LandGate.



The Challenge of Manual Calculations

When working with substation-only data, planners faced several complications:


Time-intensive analysis: Each project required examining multiple data points and performing manual calculations to determine the limiting factor.


Potential for errors: Manual processes increase the risk of miscalculations, especially when dealing with complex grid configurations.


Incomplete picture: Substation data alone doesn't capture the full capacity picture at intermediate connection points along transmission lines.


Project delays: The additional analysis time could slow down feasibility studies and project development timelines.



Available Transfer Capacity: The Foundation of Grid Analysis


Available Transfer Capacity represents the measure of available transmission capability for further commercial activity over and above already committed uses. For line taps, this metric becomes particularly valuable as it provides real-time insight into how much additional capacity can be accommodated at specific connection points. When applied to line taps, this data provides planners with immediate access to capacity information that previously required complex analysis.


LandGate Line Tap Capacity Data
LandGate Line Tap Capacity Data


Offtake Capacity Data: Completing the Picture


Offtake capacity refers to the maximum amount of power that can be withdrawn from the grid at a specific point. For renewable energy developers, industrial facility planners, and grid modernization projects, this information is essential for determining project feasibility.


Combined with ATC data, offtake capacity measurements provide a comprehensive view of what's possible at the line tap location. This dual-data approach ensures that both power injection and withdrawal scenarios are properly evaluated.



Benefits for Siting Studies and Project Development


The introduction of dedicated line tap capacity data transforms how siting studies are conducted. Instead of working with approximations and manual calculations, planners can access direct measurements that provide immediate clarity on project viability.


Enhanced Accuracy in Feasibility Analysis

Direct line tap measurements eliminate the need to estimate capacity based on substation data. This improved accuracy can mean the difference between a project moving forward or requiring costly redesigns.


Projects that might have appeared marginal under the previous analysis method may now show clear feasibility, while others that seemed promising might reveal constraints that weren't apparent in substation-only analysis.


Streamlined Planning Process

With capacity data available directly for line taps, the planning process becomes more straightforward. Engineers can quickly assess multiple potential connection points without conducting complex multi-step calculations for each location.


This streamlined approach allows for faster comparison of siting options and more efficient use of engineering resources during the early stages of project development.


Improved Project Precision

Access to specific line tap data enables more precise project sizing and configuration. Rather than designing for worst-case scenarios based on limited data, developers can optimize their projects based on actual capacity measurements.


This precision can lead to better project economics, more efficient use of grid infrastructure, and improved overall system performance.



Implementation and Integration


The new line tap capacity feature integrates seamlessly with existing platform capabilities. Users will find the same familiar interface and data presentation methods they're accustomed to when working with substation capacity information.

Data updates will follow the same schedule as existing capacity measurements, ensuring that users always have access to current grid conditions. The platform will maintain historical data for trend analysis and long-term planning purposes.


User Experience Enhancements

The addition of line tap data doesn't complicate the user experience. Instead, it provides additional precision where needed while maintaining the straightforward analysis tools users rely on for their daily work.


Search and filtering capabilities will include line tap locations, making it easy to identify potential connection points within specific geographic areas or along particular transmission corridors.



Looking Forward: Continuous Improvement in Grid Analysis


This enhancement reflects our ongoing commitment to providing comprehensive tools that meet the evolving needs of grid planners and developers. As the power system becomes more complex with increased distributed generation and changing load patterns, access to detailed, accurate capacity data becomes increasingly critical.


The addition of line tap capacity data represents one step in our continuous effort to provide better tools that streamline planning processes and improve project outcomes. By eliminating manual calculation steps and providing direct access to critical measurements, we're helping users focus on what matters most: developing successful projects that strengthen and modernize our power grid.


Users can find this new functionality with full integration into existing workflows and analysis tools. This enhancement will provide immediate value for ongoing projects while establishing a foundation for even more precise grid analysis capabilities.


To learn more about our line tap capacity data offers, schedule a demo with our dedicated energy team.


bottom of page