top of page
Batter Storage Hero.png

The only platform delivering actionable deals, quality battery storage data, & site analysis solutions

LandGate® offers industry-leading, nationwide ATC data.

Parcel Search

End-to-end solution for land origination & deal management

Achieve higher closing rates for your greenfield site selection by using the most accurate solar data, best parcel data and a modern map-based CRM

  • Search parcels based on advanced criteria such as distance to substation, transfer capacity, and more.

  • Manage your deals in a map-based CRM

  • Access the most accurate parcel data & ownership information

  • Potential capacity

  • Energy pricing & arbitrage value

  • Search government & tribal lands​

Solar Parcel Data.png
Battery Storage Data Layer.png

Data Layers

Battery storage infrastructure data

Nationwide Battery Storage & Site Control Data Layers

  • Active and queued energy storage projects 

  • Identified LLC and parent operating company

  • Associated documents and contact information

  • Available Offtake and Available Transfer Capacity to ensure potential power availability and deliverability

  • Historical and forecasted pricing details including price spreads and arbitrage analysis

  • Battery storage arbitrage data

Highest quality pricing data for confident decision making

Best in class and most accurate LMP data, delivered in partnership with Moody's.

​

  • 100% Nationwide Real-Time P-Node Coverage: Access the most extensive network of real-time p-nodes across the country.

  • Historical LMP Data Export: Seamlessly export hourly or daily historical LMP data for detailed analysis.

  • Confident LMP Forecasting: Predict future LMPs with high accuracy to inform trading strategies.

  • Congestion Price Monitoring: Track congestion prices and associated LMPs in real-time.

  • Identify Price Spikes: Quickly identify and analyze price spikes and their drivers.

  • Real-Time Constraint Monitoring: Gain insights into binding constraints as they happen.

image (7).png

Map Layers

Battery storage arbitrage pricing

Effortlessly identify high value battery storage locations with optimal arbitrage opportunities:

  • Battery Storage Arbitrage Index - Calculates daily top to bottom 4 hr avg. price margins for each price node and normalizes value across markets with a rating from 0-100 on various time scales

  • Top to Bottom 4 Hr Margin - Calculates daily top to bottom 4 hr avg. price margins in $/MWh

  • Top 4 Hr Avg. Price - Calculates daily top 4 hr average price

  • Bottom 4 Hr Avg. Price - Calculates daily bottom 4 hr avg. price

Site Analysis

General battery storage siting & feasibility software

Advanced Battery Storage Project Planning

  • Start new greenfield projects or evaluate existing battery storage projects.

  • Fully integrated data with pre-loaded inputs or adjust specific project parameters

  • Determine potential revenues without digging for local incentive pricing, PPA, or LMP data

  • Built in arbitrage analysis and interconnection queue modeling

  • Reports for interconnection queue applications to help streamline project development

image (2).png
Solar Listings.png

Listings

Ready-to-close battery storage leads

Hit your acquisition goals with nationwide battery deals and leads directly from landowners and real estate agents.

  • Over 100 million acres sourced

  • Negotiate directly with landowners

  • Active alerts of battery storage leads matching your criteria

  • Access to institutional landowners & MLS

  • Dedicated support staff to help source government leads and contacts

LandGate®'s breadth of data is also

available via export & API

SubstationReport_BAKER_STREET_Page_2.png

Automated capacity studies & engineering reports

Quickly determine injection or offtake capacity with automated engineering reports

  • Visualize network upgrades for optimal project planning

  • Access robust capacity reports with substation details, capacity results, limiting elements (transmission lines, transformers, etc) and queue information

  • Most comprehensive models for more accurate project planning

  • By year (2026, 2027,..., 2033)

  • By scenario (Base Case, Post-Contingent, Existing System or Queued)

  • Network Resource vs Energy Resource Analysis

Ready to get started?

Map Grid PAttern.png
bottom of page