NYISO Interconnection: Find Power, Navigate the Queue, Secure Your Site

Explore NYISO's interconnection process with our interactive step-by-step guide, then use LandGate’s capacity and parcel data to find the sites that can actually connect.

The map shows the process. LandGate shows how it plays out for your specific site.

NYISO Interconnection at a glance

Quick facts
NYISO
Who runs it
The New York ISO runs the grid and interconnection studies for New York State. FERC approves its rules, and the New York PSC oversees utilities and state large-load policy.
Governing rules
NYISO’s FERC-approved tariff (Attachment HH for generators) and NYISO’s load interconnection procedures
Generator study process
A two-phase cluster study. A 45-day application window and 70-day validation period are followed by Phase 1 (about 190 days), Phase 2 (about 270 days, which adds deliverability) and final decision rounds.
Current clusters
The Transition Cluster, with more than 70 GW, is in final decisions, and results haven’t been published. The 2026 Cluster is under way, with 25 requests totaling 5.1 GW posted by early September 2026.
Generator costs
A $10,000 non-refundable application fee and a study deposit of $100,000 to $250,000 depending on size. Readiness Deposit 1 is $4,000 per MW at Phase 1, Readiness Deposit 2 is the greater of that or 20% of Phase 1 cost estimates, and 100% of allocated costs is due at acceptance.
Withdrawal penalties
25% of the study deposit before Phase 1, then 50% of the study deposit plus 10% of Readiness Deposit 1, then 100% of the study deposit plus 20% of Readiness Deposit 2 in the final decision period
Large load threshold for NYISO review
Loads over 10 MW connecting at 115 kV and above, or 80 MW or more below 115 kV
How large loads connect
NYISO runs a reliability study, called a System Impact Study, but the load signs its interconnection agreement only with the utility. NYISO isn’t a party.
Large load queue
Nearly 12.7 GW across 51 projects as of May 1, 2026, per NYISO's November 16 filing.
Large load rules status
Filed at FERC on November 16, 2026, and pending. NYISO's Large Load Integration Procedures would take effect February 1, 2027, with the first regular study cycle on July 1, 2027.
Peak demand, for scale
31,097 MW on July 2, 2026, below the all-time summer peak of 33,956 MW on July 19, 2013
Last updated
November 23, 2026

NYISO Generator Interconnection Process

Generator interconnection,
step-by-step

NYISO studies generators in a two-phase cluster. Deposits rise at each decision point, and so do the penalties for leaving. Developers commit to Phase 2 before they know their deliverability results, which makes site choice especially important.

 

  1. Prepare and watch for the window. NYISO announces each cluster’s start date in advance, with a 90-day notice period before the application window opens. An optional pre-application lets developers talk with NYISO and the utility first.

  2. Apply during the 45-day window. Applications need models, a one-line diagram, a site layout, proof of site control, a $10,000 fee and a study deposit of $100,000 to $250,000 depending on size.

  3. Validation and engagement. Over 70 days, NYISO flags deficiencies, developers fix them, and NYISO and the utilities hold engagement meetings.

  4. Enter Phase 1. Developers have 5 business days to post Readiness Deposit 1, at $4,000 per MW, or withdraw. Phase 1 then studies the cluster’s local upgrade costs over about 190 days.

  5. Enter Phase 2. Developers have 10 business days to post Readiness Deposit 2, the greater of Readiness Deposit 1 or 20% of Phase 1 costs. Phase 2 adds deliverability analysis over about 270 days.

  6. Accept or reject cost allocations. In final decision rounds, developers accept their allocated costs by posting 100% as cash or security, or withdraw. NYISO reallocates costs after each round until a final round.

  7. Sign the agreement and build. Projects that accept sign an interconnection agreement with NYISO and the utility, then construction begins.

NYISO withdrawal penalties rise at each stage: 25% of the study deposit before Phase 1, 50% of the study deposit plus 10% of Readiness Deposit 1 through Phase 2 entry, and 100% of the study deposit plus 20% of Readiness Deposit 2 in the final decision period
NYISO reviews large loads over 10 MW connecting at 115 kV and above, or 80 MW or more connecting below 115 kV, with a System Impact Study for reliability. Smaller loads follow the utility’s own process.

NYISO Large Load Interconnection Process

Large Load interconnection,
step-by-step

In New York, NYISO studies large loads for reliability, but the load signs its interconnection agreement only with its utility. NYISO’s review applies to loads over 10 MW connecting at 115 kV and above, or 80 MW or more below 115 kV. NYISO, the New York PSC and FERC are all working on new large-load rules, so confirm current requirements with your utility.

​

  1. Contact your utility. The utility that would serve the site is the starting point. Loads below NYISO’s thresholds follow the utility’s own process.

  2. Request a System Impact Study. The utility or customer asks NYISO for a reliability study, and the load enters NYISO’s queue.

  3. NYISO System Impact Study. NYISO studies the load’s reliability impact on the grid.

  4. Facilities study with the utility. The utility designs the connection and any upgrades.

  5. Reliability planning. The load is included in NYISO’s reliability planning studies.

  6. Sign the agreement with your utility. The customer and utility sign the interconnection and construction agreements, and NYISO isn’t a party.

  7. Energize. The utility energizes the load once its facilities and upgrades are complete.

Monthly interconnection queue outlook

Each month, LandGate tracks every change across U.S. interconnection queues: what changed, what withdrew, where scheduled slipped, and which application windows open next.

 

Get the free report to see where the grid can still take new projects.

What's changed recently in NYISO interconnection

Last updated November 2026

NYISO’s generator process is wrapping up its first cluster under the reformed rules, and large-load rules are being rewritten at three levels at once: NYISO, the New York PSC and FERC. If your project is in NYISO’s process or headed there, check which of these changes apply before your next deadline.

 

  • February 2026: The New York PSC opened its Energize NY Development proceeding to define large loads, screen out speculative requests and make data centers bear the costs they cause. At the time, 11.9 GW of large load was in NYISO’s queue.

  • June 18, 2026: FERC issued a show-cause order finding that NYISO’s tariff may lack a clear study process for transmission service to large loads, along with safeguards like forecasts and telemetry.

  • Mid-2026: The Transition Cluster, with more than 70 GW, moved into final decision rounds after utility delays pushed its schedule back 60 days. Final results haven’t been published.

  • September 2026: NYISO’s 2026 Cluster was under way, with 25 requests totaling 5.1 GW posted. NYISO also released a draft large-load framework with firm, non-firm and zero-withdrawal service options.

  • October 2026: The large-load framework passed NYISO’s Business Issues Committee but failed its Operating Committee, with most members abstaining and some state agencies opposed.

  • November 16, 2026: NYISO filed its Large Load Integration Procedures at FERC. Firm withdrawal service would be set through a project-specific resource adequacy study over a 10-year horizon, and non-firm service would have a $200/MWh maximum bid price. Loads could support firm service through Co-Located or Partner Resource Arrangements with 15-year terms. Studies would run in grouped rounds taking roughly 18 months to two years. The filing is pending and not in effect.

  • Coming up: FERC action on NYISO's November 16 filing, with a requested February 1, 2027 effective date and a first regular study cycle on July 1, 2027; Final Transition Cluster results; Decisions in the PSC's Energize NY Development proceeding.

How LandGate Helps with NYISO Interconnection

Quickly and accurately determine the feasibility of a site in NYISO using LandGate's nationwide data

Get your projects on the grid faster with reliable transmission data.

Pick a site before the cluster window

NYISO gives 90 days’ notice before a 45-day application window, and applications need proof of site control. Search parcels by criteria such as distance to a substation and available offtake capacity, and see available transfer capacity at transmission-level injection points to find points of interconnection worth applying for.

Commit to Phase 2 with confidence

Phase 1 results don’t include deliverability, and entering Phase 2 means posting at least 20% of Phase 1 costs. LandGate’s automated offtake capacity studies show substation details, capacity results, limiting elements such as transmission lines, and queue information, so you can spot upgrade risks before you're locked in.

Find capacity for large loads

NYISO’s review threshold drops from 80 MW to just over 10 MW for loads connecting at 115 kV and above, so voltage shapes which rules apply. LandGate shows the subtransmission grid (typically between 34.5 kV and 138 kV) with hosting capacity and ATC at the line level, and its Data Center Due Diligence Reports rank the closest substations by available capacity.

Lock down the best sites

NYISO requires proof of site control at application and again to enter Phase 2. LandGate pairs its grid data with proprietary landowner leads, nationwide ownership data and contact info, and a map-based CRM to help you find, secure, and track the right parcels, including off-market properties with the ideal infrastructure profile.

See where New York’s grid is constrained before your deposits climb.

Frequently asked questions