

2026 Ranking of the Best Regions for Data Center and Renewable Colocation
After four posts on vocabulary, market forces, colocation strategy, and due diligence, this final post in the series answers the question every developer actually wants a straight answer to: which states currently have the most real, available grid capacity for a large data center, solar farm, wind project, or battery storage site. The ranking below is built directly from LandGate's own platform data, not survey responses or self-reported figures. The colocation ranking The t


How to Find and Screen Community Solar Sites: A Step-by-Step Workflow
The 5-step process for finding and screening community solar sites with LandGate looks like this: sizing up the market and competition, filtering parcels by location and grid proximity, screening each site for physical and legal constraints, drilling into grid-level detail to catch fatal upgrade costs, and finally running the economics to make a clear go/no-go decision.


The Powered-Land Due Diligence Checklist for Data Center and Renewable Developers
Whether you're evaluating a parcel for a data center campus or a utility-scale solar, wind, or battery storage project, the underlying question is the same: is this land actually powered, or is it just zoned. Parts 1 through 3 of this series covered the vocabulary and the market forces behind that question. This post turns it into a practical, step-by-step checklist you can run against any real site. Step 1: Confirm substation distance and available capacity Identify the near


The Hidden Workforce Behind Texas's Data Center Boom
Why labor availability belongs on the same site diligence checklist as power and land Texas's data center boom is running into a labor shortage as serious as its power shortage. Contractors report needing up to 6,000 workers on a single large campus, electricians (who account for roughly half of a data center's construction budget) are being pulled between overlapping projects, and the industry needs an estimated 450,000 or more new construction workers nationwide by 2027. Fo


Behind the Meter: Solar, Wind & Storage as Data Centers' Power Path
Faced with interconnection queues that stretch past six years in some markets, data center developers have started buying power directly from solar, wind, and battery storage projects instead of waiting on the public grid. This is the piece of the power crisis that connects two audiences who used to operate separately: renewable energy developers, who now have a new class of buyer for their electricity, and data center developers, for whom a well sited solar or storage projec


















